香蕉久久夜色精品升级完成,鲁一鲁一鲁一鲁一曰综合网,69一区二三区好的精华液,青青草原亚洲

世紀(jì)新能源網(wǎng)-新能源行業(yè)媒體領(lǐng)跑者,聚焦光伏、儲(chǔ)能、風(fēng)電、氫能行業(yè)。
  • 微信客服微信客服
  • 微信公眾號(hào)微信公眾號(hào)

Solectria公司為紐約兩個(gè)太陽(yáng)能項(xiàng)目提供逆變器

   2010-09-10 ne21.com21世紀(jì)新能源12870

Solectria 可再生能源有限責(zé)任公司,是逆變器生產(chǎn)商,稱(chēng)其將會(huì)與DCO能源公司(是一家技術(shù),生產(chǎn)建筑承包商)一起,為新澤西州提供大規(guī)模光伏逆變器系統(tǒng)。

項(xiàng)目系統(tǒng)中的第一系統(tǒng),位于紐約Seabrook,是一個(gè)6MW項(xiàng)目,分成兩個(gè)階段:前3MW階段已經(jīng)在運(yùn)行,并且在今年年底完成,第二個(gè)3MW,將會(huì)在2011年春季開(kāi)始生產(chǎn)。Solectria公司將會(huì)提供12個(gè)小型逆變器。

Solectria Renewables LLC, a U.S.-based PV inverter manufacturer, says it will supply commercial and utility-scale inverters for photovoltaic systems in New Jersey in partnership with DCO Energy, an engineering, procurement and construction contractor.

The first system, located in Seabrook, N.J., is a 6 MW project divided into two phases: The first 3 MW phase is already under way and will be completed by the end of the year, and the second 3 MW phase will begin construction in spring 2011. For this project, Solectria will provide 12 of its SmartGrid inverters (SGIs).

The second system will be a 2.5 MW ground-mounted system co-located at South Jersey Industries natural-gas storage facility in McKee City, N.J. The system will be tied directly to the grid and is scheduled to begin construction in the first quarter of 2011. For this project, Solectria will provide seven of its SGIs.

 

 
標(biāo)簽: 光伏
反對(duì) 0舉報(bào) 0 收藏 0 評(píng)論 0
 
更多>同類(lèi)資訊
2024全球光伏品牌100強(qiáng)榜單全面開(kāi)啟【申報(bào)入口】 2024第二屆中國(guó)BIPV產(chǎn)業(yè)領(lǐng)跑者論壇
推薦圖文
推薦資訊
點(diǎn)擊排行